WATER & SEWER.

Hialeah Water Main – Design & Construction Documents

Location: Hialeah, FL

Client: City of Hialeah Water & Sewer Dept.

PROJECT DESCRIPTION

This project consisted of the civil engineering design and preparation of construction documents for the construction of a new transmission water main from the MDWASD Preston Water Plant to a connection point at NW 87th Avenue and W. 80th Street, to serve the newly annexed area to the City of Hialeah. This work included contracting and coordinating all work with specialty firms (Surveyors, Geotechnical, & Structural Engineers); and the preparation and submittal design calculations, applications and plans for review by local regulatory agencies. Additional duties included attending meetings and assisting the City in coordinating the project with MDWASD and FDOT; conducting a hydraulic analysis of the proposed water main to determine size of line and verify compliance with previous prepared Annex Area Water and Sewer Master Plan; and the design of approximately 43,000 linear feet of 36-inch water main pipeline, including three canal crossings, one railroad track crossing, one expressway crossing, a meter station, and a low pressure shut-off valve system.

MDWASD Pump Stations Upgrades

Location: Miami-Dade County

Client: Miami Dade County Water & Sewer Dept.

PROJECT DESCRIPTION

SRS provided engineering design and preparation of construction documents (Plans and Specifications) for the construction of upgrades to existing Pump Stations. Upgrades included new pumping units, new electrical control panels, new electrical services, new telemetry systems, replacement of PS piping, new valve vaults and fittings, new wet wells, demolition of existing pump stations, and associated site improvements. Services also included plans processing and permitting; and bid phase services. SRS also provided limited construction support services including attending construction meetings, respond to RFI’s, review shop drawings, review and approval to change order requests, attend PS Start Up Inspection. MDWASD Pump Stations Nos. 7, 64, 140, 427, 430, 502, 767, and 1018.

Hialeah Force Main – Design & Construction Documents

Location: Hialeah, FL

Client: City of Hialeah Water & Sewer Dept.

PROJECT DESCRIPTION

This project consisted of the civil engineering design and preparation of construction documents for the construction of a new transmission force main. The new force main constructed from NW 87th Avenue and W. 80th Street to a connection point with the existing MDWASD force main located at W. 8th Avenue and W. 76th Street, to serve the newly annexed area to the City of Hialeah. This work included contracting and coordinating all work with specialty firms (Surveyors, Geotechnical, & Structural Engineers); and the preparation and submittal design calculations, applications and plans for “dry-run” and “final” review by local regulatory agencies. This work included attending meetings and assisting the City in coordinating the project with MDWASD and FDOT; conducting a hydraulic analysis of the proposed force main to determine size of line and verify compliance with previous prepared Annex Area Water and Sewer Master Plan; and the design of approximately 16,900 linear feet of 36-inch force main pipeline, including one canal crossing and one expressway crossing.